Interop.MSProject.dll

Assembly imported from type library 'MSProject'.

NTS Informatica Srl

The file Interop.MSProject.dll, re-signed by NTS Informatica Srl, is an Interop assembly that has been intergated by a 3rd-party into a .Net application.
Publisher:
NTS Informatica Srl  (signed and verified)

Product:
Assembly imported from type library 'MSProject'.

Version:
4.3.0.0

MD5:
8099da5ac340bae216bd821ddacf8992

SHA-1:
9cac50b98201c623b781873ba0af013a9d134c0f

SHA-256:
c339aa258800bfacc884408852a98c565f43e3deaac322e13690ffaff7c5ee4c

Scanner detections:
0 / 68

Status:
Clean (as of last analysis)

Analysis date:
4/23/2024 6:12:44 PM UTC  (today)

File size:
434.3 KB (444,712 bytes)

Product version:
4.3.0.0

Original file name:
Interop.MSProject.dll

File type:
Dynamic link library (Win32 DLL)

Common path:
C:\Program Files\bus\interop.msproject.dll

Digital Signature
Authority:
VeriSign, Inc.

Valid from:
8/7/2012 2:00:00 AM

Valid to:
10/7/2015 1:59:59 AM

Subject:
CN=NTS Informatica Srl, OU=Digital ID Class 3 - Microsoft Software Validation v2, O=NTS Informatica Srl, L=RIMINI, S=RIMINI, C=IT

Issuer:
CN=VeriSign Class 3 Code Signing 2010 CA, OU=Terms of use at https://www.verisign.com/rpa (c)10, OU=VeriSign Trust Network, O="VeriSign, Inc.", C=US

Serial number:
2815B155D6FABA064A09225B6F00D1D5

File PE Metadata
Compilation timestamp:
11/2/2009 5:19:14 PM

OS version:
4.0

OS bitness:
Win32

Subsystem:
Windows Console

Linker version:
8.0

.NET CLR dependent:
Yes

CTPH (ssdeep):
12288:oSN4b2hc8W9ErqRo/ulMTC6SFHM3iecofoLPsUNsSomOLP:oSN4b2hc8W9ErqRo/ulMTC6lSHofugmW

Entry address:
0x6961E

Entry point:
FF, 25, 00, 20, 40, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00...
 
[+]

Developed / compiled with:
Microsoft Visual C# / Basic .NET

Code size:
416 KB (425,984 bytes)

Scan Interop.MSProject.dll - Powered by Reason Core Security