athenamsproject.dll

MindGenius Version 2

MindGenius Ltd

Publisher:
MindGenius Ltd  (signed and verified)

Product:
MindGenius Version 2

Description:
MindGenius MsProject Dll

Version:
2.510.5.3

MD5:
ceeb4e1fc3b4532f02701f21226fa9f2

SHA-1:
6a069fc6be54aa572c5387b77f68b638b93bd216

SHA-256:
996e366749e08b73b1f4113993750ac4eb055e9aef162d104c205ec5ec78e9e7

Scanner detections:
0 / 68

Status:
Clean (as of last analysis)

Analysis date:
9/18/2026 5:31:01 AM UTC  (today)

File size:
489.8 KB (501,568 bytes)

Product version:
02.510

Copyright:
Copyright © 2008 by MindGenius Ltd.

Trademarks:
All rights reserved world wide

File type:
Dynamic link library (Win32 DLL)

Language:
English (United Kingdom)

Common path:
C:\Program Files\gael\mindgenius\athenamsproject.dll

Digital Signature
Signed by:

Authority:
VeriSign, Inc.

Valid from:
5/1/2008 1:00:00 AM

Valid to:
5/2/2010 12:59:59 AM

Subject:
CN=MindGenius Ltd, OU=Digital ID Class 3 - Microsoft Software Validation v2, O=MindGenius Ltd, L=East Kilbride, S=Scotland, C=GB

Issuer:
CN=VeriSign Class 3 Code Signing 2004 CA, OU=Terms of use at https://www.verisign.com/rpa (c)04, OU=VeriSign Trust Network, O="VeriSign, Inc.", C=US

Serial number:
3B72C6AA7CDBAB3E9E4C658140DB699F

File PE Metadata
Compilation timestamp:
4/2/2009 10:22:34 AM

OS version:
4.0

OS bitness:
Win32

Subsystem:
Windows GUI

Linker version:
2.25

CTPH (ssdeep):
6144:JL+NpKnNztDGMJ7y/1JCLctA/v7G5VUQj6uM0m5hCFxhYZahhCx:w4DGMJ7y/3twK5VUQj6pIxYZa2

Entry address:
0x488C8

Entry point:
55, 8B, EC, 83, C4, C4, B8, 30, 81, 29, 10, E8, 74, 8B, FB, FF, E8, 6B, 88, FB, FF, 8D, 40, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00...
 
[+]

Entropy:
6.9025

Developed / compiled with:
Microsoft Visual C++

Code size:
286.5 KB (293,376 bytes)

Scan athenamsproject.dll - Powered by Reason Core Security