athenamsproject.dll

MindGenius Version 4

MindGenius Ltd

Publisher:
MindGenius Ltd  (signed and verified)

Product:
MindGenius Version 4

Description:
MindGenius MsProject Dll

Version:
4.0.20.2197

MD5:
e773392e72019179edbbeefb5aa9e155

SHA-1:
fe42710fbb1f3e07bcdb7520c3130e604857dd70

SHA-256:
78c99765c60666845b83fb98304c95c15b424a54d3cc85340e424082de2386b3

Scanner detections:
0 / 68

Status:
Clean (as of last analysis)

Analysis date:
10/28/2026 5:40:10 AM UTC  (today)

File size:
1000.9 KB (1,024,896 bytes)

Product version:
04.000.20

Copyright:
Copyright © 2011 by MindGenius Ltd.

Trademarks:
All rights reserved world wide

File type:
Dynamic link library (Win32 DLL)

Language:
English (United Kingdom)

Common path:
C:\Program Files\mindgenius\v4\athenamsproject.dll

Digital Signature
Signed by:

Authority:
VeriSign, Inc.

Valid from:
3/25/2010 12:00:00 AM

Valid to:
5/1/2012 12:59:59 AM

Subject:
CN=MindGenius Ltd, OU=Digital ID Class 3 - Microsoft Software Validation v2, O=MindGenius Ltd, L=East Kilbride, S=Scotland, C=GB

Issuer:
CN=VeriSign Class 3 Code Signing 2009-2 CA, OU=Terms of use at https://www.verisign.com/rpa (c)09, OU=VeriSign Trust Network, O="VeriSign, Inc.", C=US

Serial number:
31CD4D725370E3A926EAA1B73D7BB4CC

File PE Metadata
Compilation timestamp:
5/30/2011 1:03:58 PM

OS version:
5.0

OS bitness:
Win32

Subsystem:
Windows GUI

Linker version:
2.25

Entry address:
0x93FD4

Entry point:
55, 8B, EC, 83, C4, C0, B8, 7C, DD, B5, 13, E8, 68, D6, F6, FF, E8, DF, D1, F6, FF, 8D, 40, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, FF, FF, FF, FF, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, DC, 15, AD, 13, 78, 15, AD, 13, 34, 15, AD, 13, A4, 15, AD, 13, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 19, 9B, C5, 96, BB, 03, C5, 4B, B4, 8B, EB, 1B...
 
[+]

Entropy:
6.5030

Developed / compiled with:
Microsoft Visual C++

Code size:
584.5 KB (598,528 bytes)

Scan athenamsproject.dll - Powered by Reason Core Security