Otl.Connectors.MsProject.dll

Otl.Connectors.MsProject

Office Timeline

Publisher:
Office Timeline  (signed and verified)

Product:
Otl.Connectors.MsProject

Version:
3.10.4.0

MD5:
5440481e3cb8be0377e558632e8da4ce

SHA-1:
d903ea841aa132c84f4be8b40b673dbe5c98d2e8

SHA-256:
1280783a1c10c42654d39a549d918e2380372740b08b6d82dada05ef44715d50

Scanner detections:
0 / 68

Status:
Clean (as of last analysis)

Analysis date:
10/12/2026 6:19:15 PM UTC  (today)

File size:
24.1 KB (24,648 bytes)

Product version:
3.10.4.0

Copyright:
Copyright © 2015

Original file name:
Otl.Connectors.MsProject.dll

File type:
Dynamic link library (Win64 DLL)

Common path:
C:\Program Files\office timeline\current\otl.connectors.msproject.dll

Digital Signature
Signed by:

Authority:
COMODO CA Limited

Valid from:
7/10/2015 2:00:00 AM

Valid to:
7/10/2018 1:59:59 AM

Subject:
CN=Office Timeline, O=Office Timeline, STREET=11163 NE 162nd St, L=Bothell, S=WA, PostalCode=98011, C=US

Issuer:
CN=COMODO RSA Code Signing CA, O=COMODO CA Limited, L=Salford, S=Greater Manchester, C=GB

Serial number:
00C80171D15A779BFD47598F697B19FAE6

File PE Metadata
Compilation timestamp:
2/22/2017 12:17:59 PM

OS version:
4.0

OS bitness:
Win64

Subsystem:
Windows Console

Linker version:
48.0

.NET CLR dependent:
Yes

Entry address:
0x5EE6

Entry point:
4D, 5A, 90, 00, 03, 00, 00, 00, 04, 00, 00, 00, FF, FF, 00, 00, B8, 00, 00, 00, 00, 00, 00, 00, 40, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 00, 80, 00, 00, 00, 0E, 1F, BA, 0E, 00, B4, 09, CD, 21, B8, 01, 4C, CD, 21, 54, 68, 69, 73, 20, 70, 72, 6F, 67, 72, 61, 6D, 20, 63, 61, 6E, 6E, 6F, 74, 20, 62, 65, 20, 72, 75, 6E, 20, 69, 6E, 20, 44, 4F, 53, 20, 6D, 6F, 64, 65, 2E, 0D, 0D, 0A, 24, 00, 00, 00, 00, 00, 00, 00...
 
[+]

Code size:
16 KB (16,384 bytes)

Scan Otl.Connectors.MsProject.dll - Powered by Reason Core Security