vlc_installer_dreamsprojects.exe

Click Telecom, S.L

The application vlc_installer_dreamsprojects.exe by Click Telecom, S.L has been detected as a potentially unwanted program by 1 anti-malware scanner with very strong indications that the file is a potential threat.
Publisher:
Click Telecom, S.L  (signed and verified)

MD5:
501e2e25ae5f0b5249f20665586eb39b

SHA-1:
579a3e456346138f2a1c094ea33c7f7a2dee190b

SHA-256:
93fb5f078df0d20e0a09aa50639d2dec860862b83db5907e92820445f2c132b1

Scanner detections:
1 / 68

Status:
Potentially unwanted

Analysis date:
8/31/2026 11:01:18 AM UTC  (today)

Scan engine
Detection
Engine version

Reason Heuristics
PUP.ClickTelecomSL.Installer (M)
16.2.15.13

File size:
266.8 KB (273,248 bytes)

File type:
Executable application (Win32 EXE)

Common path:
C:\users\{user}\downloads\vlc_installer_dreamsprojects.exe

Digital Signature
Authority:
GlobalSign nv-sa

Valid from:
1/12/2012 12:17:24 PM

Valid to:
1/12/2013 12:17:24 PM

Subject:
CN="Click Telecom, S.L", O="Click Telecom, S.L", S=Madrid, C=ES

Issuer:
CN=GlobalSign CodeSigning CA - G2, O=GlobalSign nv-sa, C=BE

Serial number:
11214C950306951990DA8E40E5172534E8C5

File PE Metadata
Compilation timestamp:
2/18/2012 4:36:00 AM

OS version:
5.0

OS bitness:
Win32

Subsystem:
Windows GUI

Linker version:
9.0

CTPH (ssdeep):
3072:HkwrlC1YYGSJJjqGkuIT++2ac7hXQkqIcv9emk3ew+fU8vQeApbNllRi2+55Xk72:5aYYGaqvcF9cv9CH85AphlaHDACNr

Entry address:
0x19029

Entry point:
E8, B6, 50, 00, 00, E9, 78, FE, FF, FF, 6A, 0C, 68, 38, 42, 43, 00, E8, C1, 15, 00, 00, 33, F6, 89, 75, E4, 33, C0, 8B, 5D, 08, 3B, DE, 0F, 95, C0, 3B, C6, 75, 20, E8, EB, 19, 00, 00, C7, 00, 16, 00, 00, 00, 56, 56, 56, 56, 56, E8, 55, F4, FF, FF, 83, C4, 14, 83, C8, FF, E9, CD, 00, 00, 00, 33, C0, 39, 75, 0C, 0F, 95, C0, 3B, C6, 74, D4, 89, 5D, 08, 53, E8, CA, 51, 00, 00, 59, 89, 75, FC, F6, 43, 0C, 40, 75, 77, 53, E8, D6, 5B, 00, 00, 59, 83, F8, FF, 74, 1B, 83, F8, FE, 74, 16, 8B, D0, C1, FA, 05, 8B, C8...
 
[+]

Code size:
174 KB (178,176 bytes)

Remove vlc_installer_dreamsprojects.exe - Powered by Reason Core Security